This diagram was an enhancement of an existing field layout and shows the exclusion zones that need to be avoided while a drill rig is on locations. In addition to the exclusion zones colour has been used to identify the oil, gas and water wells. This simple diagram shows what components of the subsea installation could not be installed when the drill rigs were in particular locations and acts as an aid to sequencing and optimising the construction and drilling schedules.